HomeIPOKaramtara Engineering

Karamtara Engineering IPO: Full Details, GMP Today, Subscription Status & Analysis

Upcoming MAINBOARDBy DostIpo Research DeskUpdated: Saturday, 05 September 2026, 12:12 IST

The Karamtara Engineering IPO is scheduled to hit the primary market on 09 Sep 2026, with bidding closing on 11 Sep 2026. Key details on record: a ₹875 Cr book-built issue, price band of ₹241–₹254 per share, grey market premium of +₹40 (+15.7%). Shares are expected to list on 17 Sep 2026.

Last updated: 05 Sep 2026, 12:12 IST · auto-refreshed from live GMP, subscription feeds and the company's RHP

Karamtara Engineering IPO, Key Facts at a Glance

StatusUpcoming
Issue typeMainboard
Price band₹241–₹254
Lot size59 shares
Issue size₹875 Cr
Face value10
Bidding opens09 Sep 2026
Bidding closes11 Sep 2026
Allotment15 Sep 2026
Listing date17 Sep 2026
ExchangeBSE, NSE
RegistrarMUFG Intime India Pvt.Ltd.

Karamtara Engineering IPO GMP Today

Grey Market Premium unofficial
+₹40
vs upper band ₹254 · updated 05 Sep 2026, 12:12 IST
Premium+15.7%
Est. Listing₹294
TrendSteady
What is GMP and how to read it?

Unlisted shares of Karamtara Engineering are changing hands at a premium of +₹40 over the issue price, with the premium climbing through the day. That implies an indicative listing near ₹294, roughly +15.7% above the upper band. For one retail lot of 59 shares, that translates to an estimated paper profit of about ₹2,360.

GMP is an unofficial, unregulated market signal. It moves daily and does not guarantee the actual listing price. The grey market premium is an unofficial, off-exchange quote where shares change hands before listing. A rising GMP usually means the market expects a strong debut; a fading one suggests cooling enthusiasm. SEBI does not recognise grey-market trades, there is no settlement guarantee, and the actual listing price is decided by normal order-book demand on debut day.

Karamtara Engineering IPO Price Band & Lot Size

Price Band₹241-₹254
Lot Size59 shares
Face Value10
Min Investment₹14,219
At Cut-off₹14,986

One market lot comprises 59 shares. Applications above ₹2 lakh fall under the non-institutional (HNI) category.

Karamtara Engineering IPO Important Dates & Timeline

Mark these dates, the full subscription-to-listing cycle typically wraps up in under two weeks. India now runs on a T+3 settlement cycle, meaning bidding closes, allotment is finalised and shares hit Demat accounts within roughly three working days of the close, with listing following the very next trading day. Refunds for unsuccessful applicants happen automatically, ASBA/UPI blocks are released without any forms or follow-ups:

Opening date09 Sep 2026
Closing date11 Sep 2026
Allotment finalisation15 Sep 2026
Refund / UPI unblock16 Sep 2026
Share credit to demat16 Sep 2026
Listing date17 Sep 2026

Karamtara Engineering IPO Subscription Status

Subscription figures will appear here once bidding opens and the registrar/exchange begins publishing demand data.

How to interpret the ratios

QIB demand reflects what mutual funds, insurers and alternative funds think of the valuation; NII (HNI) bookings often track expected listing pops; retail demand shows crowd sentiment. A book that is strong across all three categories is far more reassuring than one carried by a single segment. Remember: heavier oversubscription also means a lottery-style retail allotment, so apply only what you can comfortably bid for.

Karamtara Engineering IPO, Financial Performance (Restated)

On a restated consolidated basis, the company revenue increased by 36% and profit after tax (PAT) rose by 64% between the financial year ending with March 31, 2026, a useful one-line read on operating momentum heading into the listing.

Here is how the books have moved over the last three financial years:

31 Mar 2026 to 31 Mar 2024₹ Crore
Particulars31 Mar 202631 Mar 202531 Mar 2024
Assets4,142.242,762.591,844.56
Total Income4,316.363,165.362,427.12
Profit After Tax228.75139.33102.65
EBITDA498.11346.83262.93
Net Worth1,219.40982.67552.92
Reserves926.55690.53547.46
Total Borrowings1,030.13556.28508.51

All figures in ₹ Crore unless stated otherwise. Source: restated financials disclosed in the offer documents.

Profits have scaled from ₹102.65 Cr to ₹228.75 Cr over two years; the borrowings-to-net-worth ratio has eased to about 0.84. For investors, the trend matters more than any single year, steady compounding with contained leverage is what institutional bidders typically reward, while a late spike in borrowings deserves scrutiny against the stated objects of the issue.

Karamtara Engineering IPO, Key Performance Indicators (KPI)

ROE20.77%
RoCE23.27%
Return on Net Worth20.78%
Debt / Equity0.84
NAV per share41.72
Price to Book6.09

Reading these numbers. RoE and RoCE measure how efficiently the business turns shareholder capital into profit; anything in double digits is respectable, mid-twenties plus is strong. A debt-to-equity ratio well below 1 signals a balance sheet that does not depend on lenders. NAV per share anchors the book value of your bid, while price-to-book tells you how many rupees the issue is charging for each rupee of that book, compare it with listed peers in the same sector before deciding whether the premium is justified.

Karamtara Engineering IPO Valuation, Pre IPO vs Post IPO

The issue price converts into a different earnings multiple once the fresh shares hit the books. Here is the dilution-adjusted picture:

EPS (₹)7.75→ 7.11 post-IPO
P/E (x)32.77→ 35.72 post-IPO
Market Cap at offer₹7,499Cr→ ₹8,174.30 Cr post-IPO

Pre-IPO figures are computed on the pre-issue share count; post-IPO figures assume full subscription at the upper band.

Karamtara Engineering IPO, Competitive Strengths (as disclosed in the RHP)

Key strengths as disclosed in the RHP

As disclosed under "Competitive Strengths" in the company's offer document.

Karamtara Engineering IPO, Promoter Holding & Dilution

Pre-IPO94.79%
Post-IPO (expected)83.64%

Promoter holding comes down after the issue. Some dilution is inherent to every IPO, the question is whether the fresh-money component is funding growth (capacity, debt reduction) or simply an exit for early shareholders. Weigh the split between the fresh issue and the offer-for-sale alongside this number before forming a view.

Karamtara Engineering IPO Allotment Status, How to Check Online

Allotment: 15 Sep 2026Registrar: MUFG Intime India Pvt.Ltd.
1
Registrar website

visit MUFG Intime India Pvt.Ltd., open the IPO status page, select "Karamtara Engineering IPO", enter PAN or application number and view your status.

2
BSE / NSE website

Enter your application number and PAN on the exchange allotment page to see the shares allotted.

3
Your bank / UPI app

The mandate shows "blocked" until allotment, then the amount is either debited for allotted shares or released automatically.

Karamtara Engineering IPO Listing Date & Price Prediction

Listing Estimate₹294

Shares are scheduled to list on 17 Sep 2026.

Grey-market math points to an indicative listing near ₹294 (+15.7%); with an AI-predicted listing move of 16.4%.

How the debut actually works

New listings open with a special pre-open call auction: the exchange matches buy and sell orders to discover an opening price, after which normal trading begins. Newly listed counters trade in price bands (circuit limits) on day one, which caps how far the stock can swing from its base price. If you applied and were allotted, shares are already in your Demat before the bell, you can sell at open or hold; if you missed the allotment, you can still buy on debut, but chasing a euphoric opening is a well-known way to overpay.

About Karamtara Engineering, Company & Sector

SectorRenewable Energy and Transmission Line Products

A detailed business-model breakdown is added by the research desk once the official prospectus (DRHP/RHP) disclosures are fully parsed.

Listed Peer Comparison (per RHP)

Peer group as disclosed under "Basis for Issue Price" in the RHP

Inox Wind Limited
P/E27.08
ROE8.32%
Waaree Energies Limited
P/E20.48
ROE32.48%
KP Green Engineering Limited
P/E9.65
ROE32.32%
Suzlon Energy Limited
P/E20.25
ROE40.64%
Premier Energies Limited
P/E30.15
ROE42.35%
Vikram Solar Limited
P/E12.70
ROE21.34%

Values as printed in the RHP; compare against the issue's own post-IPO P/E before judging valuation.

Listed Peer Comparison

Peer comparison data is not available in the RHP for this issue. Some SME IPOs do not include a peer group section in the offer document.

Karamtara Engineering IPO, Objects of the Issue

Total Issue Size₹875 Cr
Mainboard Issue

The stated objects, typically a mix of debt repayment, working-capital funding, capacity expansion and general corporate purposes, are set out in the Red Herring Prospectus. The DostIpo desk summarises the object-by-object break-up here once the RHP is parsed in full; until then, treat the prospectus as the authoritative source.

Karamtara Engineering IPO, Official Documents (RHP / DRHP)

Verify every claim against the primary source. These are statutory public disclosures filed with SEBI / the Registrar of Companies, free to read, no registration needed:

Red Herring Prospectus (RHP)

Official SEBI filing with the complete and authoritative picture.

Open RHP →
Abridged Prospectus

Quick PDF summary of the issue for fast reading.

Open PDF →

Links point to SEBI's official filings repository. The RHP contains the authoritative financials, risk factors, promoter details and objects of the issue.

How to Apply for Karamtara Engineering IPO, Step-by-Step

Applying takes under five minutes if your Demat account and UPI ID are ready. There are two standard routes:

1
Route 1, UPI via your broking app (most common)

Open Zerodha Console, Groww, Upstox, Angel One or any UPI-enabled broker, go to the Invest/Orders IPO section, select Karamtara Engineering, enter your lot quantity and bid price (or choose cut-off), add your UPI ID and approve the mandate in your UPI app. Funds stay blocked in your own account until allotment, nothing leaves upfront.

2
Route 2, ASBA via your bank

Log in to your bank’s net-banking, find the IPO/ASBA section, pick the issue, enter your Demat DP ID and bid details, then submit. The exact amount is blocked and released automatically if no shares are allotted.

Last day caution: applications above ₹2 lakh fall in the non-institutional bucket. Bids submitted after 11 Sep 2026 will not be accepted, mandate approvals can take time on the final evening.

Track Karamtara Engineering IPO GMP day-by-day on the dedicated GMP page →

DostIpo Engine · Live Analysis

DostIpo Intelligence Report

The sections below are generated automatically by the DostIpo intelligence engine from timestamped snapshots: RHP disclosures, live subscription captures and grey-market tracking. Every claim traces back to a stored data point; where inputs are still missing, the engine says so instead of filling gaps.

Score X-Ray54/100

Composite of seven weighted categories, category-by-category evidence below.

X-Ray Evidence

GMP & Sentiment5/20

GMP implies 16% listing premium on the upper band

Subscription StrengthPENDING

Bidding has not opened or live figures unavailable — category skipped, not scored 0

Financial Growth15/15

PAT moved from Rs102.65 Cr to Rs228.75 Cr (+123%) across restated years

Valuation9/15

Post-IPO P/E of 35.72x looks fullish but within range for quality names

Promoter & Structure10/10

promoters retain 83.64% post-issue; 77% of the raise is fresh capital for the company

Risk Factors13/15

moderate leverage (D/E 0.84); EBITDA margin stable/up at 12%; clean RHP read: no litigation, related-party or regulatory-action flags

Industry2/10

Post-issue P/E 35.72x vs RHP peer median 20.25x (Renewable Energy and Transmission Line Products): steep premium to peer median (1.76x) — pricing demands outperformance

Data-Based SignalSIGNAL: MIXED
Strongest PillarFinancial Growth (15/15)
Weakest PillarIndustry (2/10)

This is an automated reading of the evidence above, not investment advice.

Risk Factors (per RHP)
Competitive Strengths
Objects of the Issue
Funding prepayment, repayment and/or payment obligations to lenders towards borrowings and Acceptances, in part or full6,000.00
General corporate purposes[●]
Listed Peers (per RHP)
Inox Wind Limited
P/E 27.08 · ROE 8.32% · Face Value: 10.00; Closing Price (Aug 28, 2026): 71.76; Market Cap: 1,24,018.35 Cr; Revenue FY2026: 43,971.20 Cr; EPS Basic: 2.65; EPS Dilute: 2.65; NAV: 36.93
Waaree Energies Limited
P/E 20.48 · ROE 32.48% · Face Value: 10.00; Closing Price (Aug 28, 2026): 2639.00; Market Cap: 7,59,111.87 Cr; Revenue FY2026: 265,367.70 Cr; EPS Basic: 129.10; EPS Dilute: 128.84; NAV: 501.90
KP Green Engineering Limited
P/E 9.65 · ROE 32.32% · Face Value: 5.00; Closing Price (Aug 28, 2026): 262.00; Market Cap: 13,100.00 Cr; Revenue FY2026: 12,455.69 Cr; EPS Basic: 27.15; EPS Dilute: 27.15; NAV: 91.52
Suzlon Energy Limited
P/E 20.25 · ROE 40.64% · Face Value: 2.00; Closing Price (Aug 28, 2026): 46.78; Market Cap: 6,42,888.07 Cr; Revenue FY2026: 166,791.10 Cr; EPS Basic: 2.31; EPS Dilute: 2.31; NAV: 6.90
Premier Energies Limited
P/E 30.15 · ROE 42.35% · Face Value: 1.00; Closing Price (Aug 28, 2026): 1014.00; Market Cap: 4,60,306.83 Cr; Revenue FY2026: 78,243.74 Cr; EPS Basic: 33.63; EPS Dilute: 33.63; NAV: 95.09
Vikram Solar Limited
P/E 12.70 · ROE 21.34% · Face Value: 10.00; Closing Price (Aug 28, 2026): 172.70; Market Cap: 62,578.60 Cr; Revenue FY2026: 48,022.51 Cr; EPS Basic: 13.68; EPS Dilute: 13.60; NAV: 87.43
Saatvik Green Energy Limited
P/E 14.23 · ROE 41.97% · Face Value: 2.00; Closing Price (Aug 28, 2026): 423.60; Market Cap: 53,841.68 Cr; Revenue FY2026: 45,484.37 Cr; EPS Basic: 29.83; EPS Dilute: 29.76; NAV: 107.08
Emmvee Photovoltaic Power Limited
P/E 18.87 · ROE 51.12% · Face Value: 2.00; Closing Price (Aug 28, 2026): 323.95; Market Cap: 2,24,285.17 Cr; Revenue FY2026: 50,498.77 Cr; EPS Basic: 17.17; EPS Dilute: 17.17; NAV: 53.37
Business Model
Industry Snapshot

Market vs Fundamentals vs AI

Market View26/100
Fundamental View79/100
AI View64/100

Fundamentals are notably stronger than current market sentiment; the grey market may be underpricing the balance sheet.

Signal Flags (1 flags)

CautionBorrowings rising

Borrowings climbed from Rs508.51 Cr to Rs1030.13 Cr over the restated years. (Restated financials)

What supports the issue:

All intelligence outputs are data-based observations for education, not recommendations. Methodology: see the Data Methodology page.

Should You Invest in Karamtara Engineering IPO? DostIpo Verdict

DostIpo Data-Based SignalSIGNAL: MIXED
Strongest PillarFinancial Growth (15/15)
Weakest PillarIndustry (2/10)
  • Score covers 85/100; remaining pillars pending data (not penalised)

DostIpo is not SEBI-registered. This is an automated, data-based signal for education only. Read the RHP risk factors and consult a SEBI-registered adviser; whether to invest is entirely your decision.

Frequently Asked Questions

What is the Karamtara Engineering IPO price band?

The price band is ₹241–₹254 per share.

What is the Karamtara Engineering IPO lot size and minimum investment?

Lot size is 59 shares; minimum estimated investment ~₹14,219 (lower band).

When does the Karamtara Engineering IPO open and close?

The IPO opens on 09 Sep 2026 and closes on 11 Sep 2026.

When is the Karamtara Engineering IPO allotment?

The allotment date is 15 Sep 2026 (official registrar/exchange date; minor delays are possible).

What is the Karamtara Engineering IPO GMP?

Estimated grey market premium is +₹40. GMP is unofficial and not a listing-price guarantee.

Is Karamtara Engineering IPO good for listing gain?

DostIpo's model gives an indicative 16.4% listing-range estimate (editorial signal, not guaranteed). Apply only after your own research and risk assessment.

When will Karamtara Engineering IPO list on the exchange?

Listing is scheduled for 17 Sep 2026 on BSE, NSE. The listing price is set by market demand on debut day, GMP is only an unofficial hint.

Who is the registrar for Karamtara Engineering IPO?

MUFG Intime India Pvt.Ltd. is managing the issue. Allotment status can be checked on its official portal using PAN, application number or DP/client ID once the basis of allotment is finalised.

How can I apply for Karamtara Engineering IPO?

You can apply through any UPI-enabled broking app (Zerodha, Groww, Upstox, Angel One etc.) or via ASBA through your bank's net-banking. One lot is the minimum application; retail applications are capped at ₹2 lakh.

What does subscription status mean in an IPO?

Subscription shows how many times the shares on offer were bid for. A figure above 1x means the category is oversubscribed. Higher retail and QIB demand generally signals stronger conviction, though it also means lottery-based allotment.

Related Pages

Karamtara Engineering IPO GMP TodayIPO CalendarIPO GMP todayIPO SubscriptionIPO AllotmentIPO ListingIPO BasicsIPO GlossaryKanohar Electricals IPOVeegaland Developers IPOQualiance International IPOPranav Constructions IPOKanohar Electricals IPO GMPVeegaland Developers IPO GMP

← Back to all live IPOs

Disclaimer: DostIpo is an informational and educational platform and is not a SEBI-registered investment adviser or research analyst. Nothing on this page, including GMP estimates, subscription data, scores or the verdict, is investment advice, a recommendation or a solicitation to buy or sell any security. GMP is an unofficial grey-market signal. Investments in the securities market are subject to market risks; read all offer documents (RHP/DRHP) carefully and consult a SEBI-registered adviser before investing.

Last updated: 05 Sep 2026, 12:12 IST